| Your Results | Global Average | |
|---|---|---|
| Questions | 5 | 5 |
| Correct | 0 | 2.93 |
| Score | 0% | 59% |
April scored 79% on her final exam. If each question was worth 4 points and there were 280 possible points on the exam, how many questions did April answer correctly?
| 55 | |
| 54 | |
| 69 | |
| 58 |
April scored 79% on the test meaning she earned 79% of the possible points on the test. There were 280 possible points on the test so she earned 280 x 0.79 = 220 points. Each question is worth 4 points so she got \( \frac{220}{4} \) = 55 questions right.
What is the least common multiple of 6 and 12?
| 17 | |
| 12 | |
| 36 | |
| 45 |
The first few multiples of 6 are [6, 12, 18, 24, 30, 36, 42, 48, 54, 60] and the first few multiples of 12 are [12, 24, 36, 48, 60, 72, 84, 96]. The first few multiples they share are [12, 24, 36, 48, 60] making 12 the smallest multiple 6 and 12 have in common.
A triathlon course includes a 100m swim, a 50.5km bike ride, and a 7.7km run. What is the total length of the race course?
| 42km | |
| 59.6km | |
| 40.5km | |
| 58.3km |
To add these distances, they must share the same unit so first you need to first convert the swim distance from meters (m) to kilometers (km) before adding it to the bike and run distances which are already in km. To convert 100 meters to kilometers, divide the distance by 1000 to get 0.1km then add the remaining distances:
total distance = swim + bike + run
total distance = 0.1km + 50.5km + 7.7km
total distance = 58.3km
Which of the following statements about exponents is false?
b0 = 1 |
|
b1 = b |
|
b1 = 1 |
|
all of these are false |
A number with an exponent (be) consists of a base (b) raised to a power (e). The exponent indicates the number of times that the base is multiplied by itself. A base with an exponent of 1 equals the base (b1 = b) and a base with an exponent of 0 equals 1 ( (b0 = 1).
A machine in a factory has an error rate of 8 parts per 100. The machine normally runs 24 hours a day and produces 9 parts per hour. Yesterday the machine was shut down for 2 hours for maintenance.
How many error-free parts did the machine produce yesterday?
| 167.2 | |
| 121.6 | |
| 182.2 | |
| 204.6 |
The hourly error rate for this machine is the error rate in parts per 100 multiplied by the number of parts produced per hour:
\( \frac{8}{100} \) x 9 = \( \frac{8 \times 9}{100} \) = \( \frac{72}{100} \) = 0.72 errors per hour
So, in an average hour, the machine will produce 9 - 0.72 = 8.28 error free parts.
The machine ran for 24 - 2 = 22 hours yesterday so you would expect that 22 x 8.28 = 182.2 error free parts were produced yesterday.