ASVAB Arithmetic Reasoning Practice Test 620721 Results

Your Results Global Average
Questions 5 5
Correct 0 3.40
Score 0% 68%

Review

1

Cooks are needed to prepare for a large party. Each cook can bake either 5 large cakes or 12 small cakes per hour. The kitchen is available for 2 hours and 38 large cakes and 310 small cakes need to be baked.

How many cooks are required to bake the required number of cakes during the time the kitchen is available?

41% Answer Correctly
10
9
7
17

Solution

If a single cook can bake 5 large cakes per hour and the kitchen is available for 2 hours, a single cook can bake 5 x 2 = 10 large cakes during that time. 38 large cakes are needed for the party so \( \frac{38}{10} \) = 3\(\frac{4}{5}\) cooks are needed to bake the required number of large cakes.

If a single cook can bake 12 small cakes per hour and the kitchen is available for 2 hours, a single cook can bake 12 x 2 = 24 small cakes during that time. 310 small cakes are needed for the party so \( \frac{310}{24} \) = 12\(\frac{11}{12}\) cooks are needed to bake the required number of small cakes.

Because you can't employ a fractional cook, round the number of cooks needed for each type of cake up to the next whole number resulting in 4 + 13 = 17 cooks.


2

What is (z4)5?

79% Answer Correctly
z-1
z20
5z4
z9

Solution

To raise a term with an exponent to another exponent, retain the base and multiply the exponents:

(z4)5
z(4 * 5)
z20


3

Which of the following is a mixed number?

82% Answer Correctly

\({7 \over 5} \)

\({a \over 5} \)

\(1 {2 \over 5} \)

\({5 \over 7} \)


Solution

A rational number (or fraction) is represented as a ratio between two integers, a and b, and has the form \({a \over b}\) where a is the numerator and b is the denominator. An improper fraction (\({5 \over 3} \)) has a numerator with a greater absolute value than the denominator and can be converted into a mixed number (\(1 {2 \over 3} \)) which has a whole number part and a fractional part.


4

A machine in a factory has an error rate of 9 parts per 100. The machine normally runs 24 hours a day and produces 8 parts per hour. Yesterday the machine was shut down for 5 hours for maintenance.

How many error-free parts did the machine produce yesterday?

49% Answer Correctly
138.3
184.1
114.7
200.2

Solution

The hourly error rate for this machine is the error rate in parts per 100 multiplied by the number of parts produced per hour:

\( \frac{9}{100} \) x 8 = \( \frac{9 \times 8}{100} \) = \( \frac{72}{100} \) = 0.72 errors per hour

So, in an average hour, the machine will produce 8 - 0.72 = 7.28 error free parts.

The machine ran for 24 - 5 = 19 hours yesterday so you would expect that 19 x 7.28 = 138.3 error free parts were produced yesterday.


5

If a car travels 225 miles in 3 hours, what is the average speed?

86% Answer Correctly
20 mph
35 mph
15 mph
75 mph

Solution

Average speed in miles per hour is the number of miles traveled divided by the number of hours:

speed = \( \frac{\text{distance}}{\text{time}} \)
speed = \( \frac{225mi}{3h} \)
75 mph